Hualalai Villa Remodel
The existing Villa was damaged by a faulty plumbing fixture, leading to a substantial overhaul of the master bath and shower garden area.
Damaged finishes, insulation, plumbing, and electrical were removed and replaced with new contemporary finishes.
The original indoor tub was removed allowing for large glass doors that open to the new outdoor shower garden area with a trellis for shade and privacy from upper level units.
[Project developed by Aaron Spielman while employed at Rhoady Lee Architecture & Design.]
WHAT
Hualalai Villa Remodel
WHERE
Kaupulehu, HI
WHEN
December 2013
CONTRACTOR
Roland Miller, Miller Construction